General Masonry Construction performing all exterior elevation masonry work. Throughout the entire building CMU split face concrete block were used with specific design per Architectural drawings. Performed power washing was a final stage of this commercial project. The entire masonry duration lasted about 10 weeks and it was delivered on time August 2017.